| Availability: | |
|---|---|
| Quantity: | |
75kW Yuchai Power, Strong and Efficient
Equipped with a Yuchai 75kW engine, it delivers stable and strong power output. With a power head torque of 3500N·m, this solar pile foundation drilling rig efficiently completes solar pile foundation construction with φ200-300mm borehole diameter and 6-10m depth, meeting high-intensity piling needs of medium and large solar projects.
Fully Hydraulic System, Precise and Stable
Adopting a fully hydraulic control system with a rated pressure of 20MPa and 100L hydraulic tank capacity, the dual gear pump/plunger pump provides stable hydraulic power. This hydraulic piling rig for solar projects improves piling positioning accuracy, reduces manual errors, and ensures verticality and position accuracy of solar pile foundations.
25° Super Climbing Ability, Suitable for Mountain Solar
Crawler chassis design with track ground contact length of about 2400mm, width of 400mm, maximum climbing ability of 25°, and ground clearance ≥350mm. This mountain solar pile driving machine easily traverses slopes and muddy sections in medium and large solar power stations, ensuring equipment movement efficiency in complex mountain terrain.
360° In-Situ Rotation, Flexible Operation
With a minimum turning radius of 360° in-situ rotation, the reinforced M-type telescopic mast flexibly adjusts piling angles. Multi-angle piling can be completed without frequent machine movement, improving piling flexibility and operation efficiency in medium and large solar power station sites.
Enlarged Air-Cooled Radiator, Long-Term Outdoor Operation
Adopting an enlarged air-cooled radiator, no water source required, effectively reducing equipment temperature in outdoor high-temperature environments. This heavy duty solar piling equipment ensures stable operation of the power system and hydraulic system, supporting long-term continuous piling operation.
Dual-Speed Motor Drive, Efficient Movement
Dual-speed travel motor drive with a maximum travel speed of 0-3.5km/h, enabling quick movement and positioning in medium and large solar power station sites, reducing equipment transfer time and improving overall construction efficiency for large-scale solar projects.
Specifications for the PV-60 (Standard Model) Pile Driver | |||||
Parameters | Specifications | Specifications | Parameters | Parameter | Specifications |
Basic Parameters | Model | PV-60 (Standard Model) | Travel system | Travel motor | Two-speed hydraulic motor drive |
Operating weight | 6.0 ~ 6.5 tons | Max. travel speed | 0 ~ 3.5 km/h | ||
Overall dimensions (L x W x H) | Approx. 4500 × 2200 × 2800 mm | Max. gradeability | 25° | ||
Track ground contact length | Approx. 2400 mm | Min. turning radius | 360° in-situ rotation | ||
Track shoe width | 400 mm | Work equipment | Mast type | Reinforced steel mast | |
Ground clearance | ≥ 350 mm | Max. drilling/piling diameter | 200 ~ 300 mm | ||
Powertrain | Engine | Wangchai 75 kW | Max. drilling/piling depth | 6 ~ 10 m | |
Starting method | Electric start (24V) | Feed/hoist force | 35 kN / 45 kN | ||
Hydraulic System | Main pump type | Tandem gear pump / Piston pump | Rotary head torque | 3500 N·m | |
System rated pressure | 20 MPa | Application scenarios | Key selling points | "Golden tonnage" class—powerful performance and excellent stability; suitable for medium-to-large ground-mounted solar farms and highway guardrail installation. | |
Hydraulic oil tank capacity | 100 L | ||||
Cooling method | Oversized air-cooled radiator | ||||
Medium and Large Ground Solar Power Stations
For pile foundation construction of medium and large ground solar power stations, the PV-60 Standard Pile Driver's φ200-300mm large borehole and 6-10m depth operation capabilities accurately match the design of solar pile foundations. The 25° climbing ability adapts to mountain terrain of power stations, and the fully hydraulic system ensures piling accuracy, improving power station construction efficiency and stability.
Highway Guardrail Foundation Construction
Adapting to highway guardrail foundation construction, 360° in-situ rotation flexibly adjusts piling positions, dual-speed travel motor enables quick transfer, and 3500N·m power head torque efficiently completes guardrail pile construction. The fully hydraulic system ensures construction accuracy, improving construction progress and safety of highway guardrail projects.
Mountain Distributed Solar Projects
Serving mountain distributed solar projects, the crawler chassis's 25° climbing ability and ≥350mm ground clearance adapt to mountain slopes and muddy sections. The enlarged air-cooled radiator supports long-term outdoor operation, providing stable pile foundation support for mountain solar systems and realizing integrated development of solar energy and mountain terrain.
Large Infrastructure-Solar Integrated Projects
For large infrastructure-solar integrated projects such as railways and airports, the fully hydraulic system of the PV-60 Standard Pile Driver ensures piling accuracy, and the high-torque power system efficiently completes infrastructure solar pile foundation construction. Flexible in-situ rotation and climbing ability adapt to complex terrain of infrastructure sites, improving project construction efficiency.
Q: What is the piling efficiency of the PV-60 Standard Pile Driver?
A: In conventional soil or soft rock formations, the piling speed can reach about 3-5 minutes per pile (depending on formation hardness and piling depth). The 75kW Yuchai power and 3500N·m torque ensure efficient piling, improving construction progress of medium and large solar projects.
Q: What are the transportation dimensions and weight of the equipment? Which transportation method is suitable?
A: The transportation dimensions are approximately 4800×2200×2800mm, with a total weight of 6.0-6.5 tons. It is suitable for transportation by flatbed trucks. The integrated design eliminates disassembly, enabling quick commissioning upon arrival at medium and large solar power stations or infrastructure sites.
Q: What is the maintenance cycle of this pile driver?
A: The regular maintenance cycle is every 500 hours, including air filter replacement, hydraulic oil inspection, track tension adjustment, power system cleaning, etc. Drill rods and track plates are vulnerable parts, which need regular inspection and replacement based on construction intensity. We provide professional after-sales maintenance guidance and parts supply.
Q: Can piling parameters be customized according to solar project needs?
A: We can adjust mast type or piling depth adaptation range according to pile foundation design needs of medium and large solar projects. Please contact our technical team to communicate and confirm the specific customization plan.
Q: What training or qualifications are required to operate this pile driver?
A: Operators need basic construction machinery operation experience. We provide free equipment operation training covering piling techniques, safety specifications, daily maintenance, etc., ensuring operators master equipment usage skills proficiently and guarantee construction safety and efficiency.