| Availability: | |
|---|---|
| Quantity: | |
Integrated Design for Efficient Large-Scale Operations
The whole machine integrates power, air compressor and drilling systems, eliminating on-site assembly and enabling quick commissioning upon arrival at the mining area. This integrated mining drilling rig features a crawler chassis that supports autonomous movement and positioning, significantly reducing preparation time for large-scale blasting and improving construction efficiency.
Twin-Screw Air Compressor System for Stable High-Pressure Output
Equipped with a twin-screw air compressor, delivering 1.5-2.0MPa exhaust pressure and 12-16m³/min exhaust volume, it continuously provides stable power for DTH impact drilling. This DTH impact drilling machine ensures drilling efficiency in medium-hard to hard rock formations and avoids operation interruptions due to insufficient air pressure.
High Pulling Force & Rotating Torque for Complex Conditions
With 45KN maximum pulling force, it quickly resolves emergencies like stuck pipes. The rotating torque of 2000-2800N·m, combined with 60-100rpm rotating speed, achieves efficient crushing and drilling in hard rock formations, meeting the rock blast hole drilling needs of metal mines and large quarries.
Retractable Crawler Chassis for All-Terrain Adaptation
Featuring retractable track gauge, 400mm track width, ≤20° climbing ability and 0-2.8km/h walking speed, it easily traverses mining slopes and muddy roads. This crawler-type water well drilling rig adapts to complex terrain of large quarries and metal mines, ensuring equipment movement flexibility.
Pulse Dust Removal & Dual-Mode Control for Environmental Protection & Precision
The pulse reverse dust removal system effectively collects drilling dust, meeting mining environmental protection requirements. Hydraulic pilot + electric dual-mode operation improves drilling positioning accuracy, reduces human error, and ensures the precision of blasting hole positions.
Water-Cooled Radiator System for Continuous Stable Operation
The power system adopts a water-cooled radiator, maintaining stable equipment operation in high-temperature mining environments. This high-performance drilling equipment supports long-term continuous drilling to meet the high-intensity construction needs of large-scale blasting operations.
YQD-230 Ultra-heavy-duty DTH Drilling Rig Technical Specifications | |||
Parameter Name | Parameter Value | Unit | Remarks |
Basic Parameters | |||
Model | YQD-230 (Ultra-heavy Duty) | ||
Drilling Method | Down-the-Hole (DTH) Drilling | ||
Borehole Diameter Range | Φ220 – 230 mm | mm | |
Drilling Depth | 30 – 40 m | m | |
Total Machine Weight | 18,000 – 22,000 kg | kg | |
Transport Dimensions (L × W × H) | Approx. 5500 × 2800 × 3000 | mm | |
Gradeability | ≤ 18° | ° | |
Travel Speed | 0 - 2.5 km/h | km/h | |
Power System | |||
Rated Power | 191 kW | kW | |
Cooling Method | Liquid Cooling System (Dual-Fan) | ||
Air Compressor System | |||
Air Compressor Type | Twin screw air compressor (high pressure type) | ||
Discharge Pressure | >2.5 MPa | MPa | |
Air Delivery | 25 - 32 m³/min | m³/min | |
Discharge Pipe Diameter | 3.5 (90mm) | mm | |
Feed and Rotation System | |||
Feed Method | Hydraulic cylinder + chain drive | ||
Maximum Feed Force | 50 kN | kN | |
Maximum Pull-out Force | 80 kN | kN | |
Feed Stroke | |||
Rotation Head Speed | 40 - 75 rpm | rpm | |
Rotation Torque | 4000 - 5500 N·m | N·m | |
Drill Mast and Boom | |||
Mast Pitch Angle | +15° / -10° | ||
Mast Swing Angle | ±12° | ||
Mast Extension/Retraction | Telescopic | ||
Undercarriage System | |||
Undercarriage Type | Crawler-type | ||
Track Shoe Width | 500 mm | mm | |
Track Gauge | Extendable | ||
Other Parameters | |||
Dust Removal Method | Pulse-jet dust removal + Wet dust removal | ||
Control Method | Hydraulic pilot control + Electronic control + Remote monitoring | ||
Applicable Rock Type | Extremely hard rock | ||
Blasting Drilling in Hard Granite Mines
Targeting hard rock blasting needs of granite mines, 25-30m deep drilling and 165-180mm large borehole diameter accurately match blasting hole design. The 3500N·m high rotating torque efficiently crushes hard granite ore bodies, providing core drilling equipment for large-scale granite mining and improving ore mining efficiency and recovery rate.
Roadbed Blasting in Railway/Highway Infrastructure
Adapting to roadbed blasting construction of large-scale infrastructure projects such as railways and highways, the integrated design enables quick positioning, and the crawler chassis adapts to complex terrain of construction sites. 25-30m deep drilling meets deep crushing needs of roadbed blasting, improving infrastructure project progress and safety.
Bench Blasting in Large Hard Rock Quarries
Serving bench blasting operations in large hard rock quarries, the water-cooled radiator system supports long-term continuous drilling, and the pulse dust removal system reduces dust pollution. The 165-180mm large borehole diameter meets large stone crushing needs of quarries, improving stone mining efficiency.
Hard Rock Foundation Blasting in Water Conservancy Projects
For hard rock foundation blasting in water conservancy hubs and reservoirs, the high pulling force handles stuck pipe conditions, and precise drilling control ensures blasting hole accuracy, avoiding blasting impact on water conservancy foundation structures and ensuring construction safety and stability.
Q: What is the drilling efficiency of the YQD-180 rig in granite formations?
A: In hard granite formations, the drilling speed can reach about 0.8-1.5m/min (depending on rock hardness). The stable high air pressure provided by the twin-screw air compressor and high-torque system ensure efficient hard rock drilling progress.
Q: What are the transportation dimensions and weight of the equipment? Which transportation method is suitable?
A: The transportation dimensions are approximately 4800×2400×2800mm, and the whole machine weighs 10-12 tons, suitable for flatbed truck or container transportation. The integrated design eliminates disassembly, enabling quick commissioning upon arrival at the site.
Q: What is the maintenance cycle of this rig?
A: The regular maintenance cycle is every 500 hours, including air compressor filter replacement, hydraulic oil inspection, track tension adjustment, etc. Wear parts such as hammers and drill pipes need to be inspected regularly according to hard rock drilling intensity, and we provide professional after-sales maintenance guidance.
Q: Can drilling parameters be customized according to infrastructure project needs?
A: We can adjust drilling depth or borehole diameter adaptation range according to blasting design needs of railway/highway infrastructure projects. Please contact our technical team to communicate and confirm the specific customization plan.
Q: What qualifications or training are required to operate this rig?
A: Operators need to have basic construction machinery operation experience. We provide free equipment operation training covering hard rock drilling techniques, safety specifications, daily maintenance, etc., to ensure operators master equipment usage skills proficiently.